• About us
  • Privacy Policy
  • Disclaimer
  • Contact
Thursday, August 7, 2025
Pragativadi I Latest Odisha News in English I Breaking News
  • Epaper
  • Odisha
  • Twin City
  • National
  • World
  • Sports
  • Politics
  • Entertainment
  • Business
  • Tech
  • Lifestyle
No Result
View All Result
  • Epaper
  • Odisha
  • Twin City
  • National
  • World
  • Sports
  • Politics
  • Entertainment
  • Business
  • Tech
  • Lifestyle
No Result
View All Result
Pragativadi I Latest Odisha News in English I Breaking News
No Result
View All Result

Home » Amrit Station Scheme Brings Major Overhaul to Railway Infrastructure in Odisha’s KBK Region

Amrit Station Scheme Brings Major Overhaul to Railway Infrastructure in Odisha’s KBK Region

Yajati Rout by Yajati Rout
April 24, 2025
in Odisha, Trending Now
Reading Time: 4 mins read
0 0
0
0
SHARES
26
VIEWS

In a significant push towards regional development and infrastructure modernisation, the Indian Railways has launched a comprehensive redevelopment initiative under the Amrit Station Scheme for key railway stations across the KBK (Kalahandi-Balangir-Koraput) districts of Odisha.


This ambitious project aims to revolutionise rail infrastructure in the region by equipping stations with modern passenger amenities, sustainable design, and enhanced accessibility.

The Amrit Station Scheme is part of the Indian Railways’ initiatives to upgrade major and mid-level railway stations, aligning them with international standards of infrastructure and services.

 

1 of 9
- +

1.

2.

3.

4.

5.

6.

7.

8.

9.

In the KBK region, stations including Balangir, Titlagarh, Kantabanji, Kesinga, Bhawanipatna, Rayagada, Muniguda, Gunupur, Koraput, Jeypore, Damanjodi, Harishankar Road, and Khariar Road have been selected for redevelopment.


Key Features of the Redevelopment:

  • Modernised Infrastructure: Redesigned station buildings with better waiting lounges, upgraded ticketing systems, and improved platform surfaces.
  • Enhanced Accessibility: Installation of foot overbridges (FOBs) to ease movement for senior citizens, Divyangjan passengers, and families with children.
  • Eco-Friendly Development: Use of green building techniques, solar energy solutions, water conservation systems, and waste management practices.
  • Passenger-Centric Amenities: High-speed Wi-Fi, digital information boards, clean and modern toilets, state-of-the-art security systems, and improved catering facilities.
  • Urban Integration: Redesigned station circulating areas with drop-off/pick-up lanes, adequate parking, and better approach roads.
  • Boost to Local Economy: The upgrades aim to stimulate local growth by increasing tourism, improving regional mobility, and generating employment.

Station-wise Highlights:

  • Balangir (Rs. 18.01 Cr): A New Station Building with modern Passenger Amenities, Improvement to Front Façade of Existing Building, Additional Platform Shelters, Provision of 12 mtr. Wide Foot Over Bridge, Improvement to platform surface, Waiting Rooms, Lifts, Circulating Areas, Parking Areas, Standard Signages, Provision of Divyangjan facilities, Improvement to Toilets and Provision of Sewage Treatment Plant with Overhead Tank and pipeline.
  • Titlagarh (Rs. 35.79 Cr): Redevelopment of Station with modern Passenger Amenities for the passengers and Rail Users. Provision of 2nd Entry, Improvement to Front Façade of Existing Station Building, Provision of 12 mtr. Wide Foot Over Bridge (FOB), Improvement to Platform surface, Provision of additional 20 Bays Platform Shelter, Provision of three Lifts, Waiting Halls, Standard Signages, Sewage Treatment Plant with Over Head Tank and pipeline connection, Provision of Divyangjan facilities, Circulating area, parking area, Improvement to Toilets.
  • Kantabanji (Rs. 33.87 Cr): Redevelopment of station with modern amenities for passengers and rail users, Development of Second entry point, Improvement to Front Façade of existing building, Provision of 12 mtr. Wide Foot Over Bridge (FOB), Provision of lifts, Improvement to Platform surface, Raising of platforms, additional 22-bay platform shelters, Provision of Divyangjan facilities, Improvement to Toilets and Sewage Treatment Plant with Overhead Tank and pipeline connection.
  • Harishankar Road (Rs. 16.66 Cr): Redevelopment of the station with modern amenities for passengers and rail users., Development of 2nd Entry, Improvement to Front Façade of existing building, Provision of extension of 03 mtr. Wide Foot Over Bridge, Upgrades include 3 lifts, Improvement to Platform surface & additional 20 bays Platform Shelter, Standard Signage, Coach Indication Boards, Provision of Divyangjan facilities and Improvement to Toilets.
  • Kesinga (Rs. 20.85 Cr): Redevelopment of station with modern amenities for passengers and rail users, Development of 2nd Entry, Improvement to Front Façade of existing building, Provision of 12 mtr. Wide Foot Over Bridge (FOB), Improvement to Platform surface, Provision of lifts, Provision of additional 38 bays Platform Shelters, Standard Signage, Provision of Divyangjan facilities, Improvement to Toilets and modern amenities have been planned.
  • Bhawanipatna (Rs. 18.83 Cr): Redevelopment of station with modern amenities for passengers and rail users, Improvement to Front Façade of existing building, Provision of Lift, Improvement to Platform surface with PF Shelter, Standard Signage, Provision of Divyangjan facilities, Raising of platforms and modernised toilets are key elements.
  • Muniguda (Rs. 20.16 Cr): Redevelopment of station with modern amenities for passengers and rail users, Improvement to Front Façade of existing building, Wide New Foot Over Bridge (FOB), Improvement to Platform surface with PF Shelter, Provision of Coach Indication Boards, Raising of platform, Standard Signage, Provision of Divyangjan facilities, Improvement to Toilets, Provision of lifts and comprehensive passenger facilities along with Sewage Treatment Plant with Over Head Tank and pipe line connection.
  • Koraput (Rs. 21.20 Cr): Redevelopment of the station with modern amenities for passengers and rail users, Improvement to the Front Façade of the existing building, Provision of passenger lifts, Provision of 12 meter wide Foot Over Bridge (FOB), Improvement to the Platform surface areas, Raising of Platforms, enhanced platform shelters and upgraded station layout.
  • Jeypore (Rs. 17.94 Cr): Redevelopment of the station with modern amenities for passengers and rail users, Improvement to the Front Façade of the existing building, Provision of platform surfacing, Provision of lifts, digital announcements in Passenger Announcement System, and ‘One Station One Product’ stall among new additions.
  • Damanjodi (Rs. 14.46 Cr): Redevelopment of the station with modern passenger amenities, Improvement to the Front Façade of the existing building, Provision of a 12-meter-wide Foot Over Bridge (FOB), Provision of lifts, platform surface upgrades with PF Shelters.
  • Khariar Road (Rs. 16.25 Cr): Provision of New Station Building with modern amenities for passengers and rail users, Development of 2nd Entry side, Improvement to Front Façade of existing building, Provision of lifts, Improvement to platform surface with additional PF Shelters, Standard signage, Coach Indication Boards, GPS-enabled digital clocks, Provision of Divyangjan facilities, Improvement to Toilets and accessibility features.
  • Rayagada (Rs. 41.40 Cr): Provision of Additional Rooms in Existing Station Building (G+1) including Lift and Canopy, Second Entry Station Building (Only Ground Floor) including Lift and Canopy, 6 mtr wide Foot Over Bridge (FOB) of length 142 mtr Connecting both side station buildings and Platforms including Lifts, Platform Shelters and Cover over Pathways, Site Development Works, Roads and Pathways, E&M Works, Signages etc.
  • Gunupur: Gunupur Railway Station has been selected for redevelopment under the Amrit Station Scheme, aimed at modernising key railway stations across the country, especially in the KBK region of Odisha. While the estimated costs and detailed scope of work are still being finalised, Gunupur is officially part of the broader transformation plan. The redevelopment work at the station will be undertaken in due course, ensuring improved infrastructure and enhanced passenger amenities shortly.

This redevelopment is poised to transform the KBK region, which holds vast untapped potential in tourism, culture, and trade. With seamless connectivity, enhanced commuter experiences, and world-class amenities, these stations will catalyse inclusive development.

The project will be implemented in phases, with timely execution being a top priority.

Indian Railways commits to delivering a future-ready, green, and inclusive transportation ecosystem for the people of Odisha.


 

Tags: Amrit Station SchemeConnectivity EnhancementKBK RegionOdisha DevelopmentRailway Infrastructure
Previous Post

PM Modi Unveils Rs 13,480 Crore Development Projects in Bihar

Next Post

Dr. Jitendra Singh Reviews BRIC-inStem Trials, Hails Biotech’s Role in Future Economy

Yajati Rout

Yajati Rout

Yajati K. Rout is a dynamic journalist at Pragativadi, known for delivering nuanced and impactful storytelling that spans Odisha’s societal fabric to global sports arenas. His reporting navigates seamlessly between grassroots realities, high-profile political developments, and the pulse of international tennis and cricket. With a flair for SEO-driven storytelling and a deep cultural lens, Yajati crafts content that resonates with a diverse readership—bridging insight with accessibility.

Related Posts

Odisha Group C Recruitment 2025
Odisha

Odisha Group C Recruitment 2025: 22,896 Posts to Be Filled by August 31

August 7, 2025
Nithin Kamath
Business

Nithin Kamath Invests in Capitalmind, Reunites with Early Zerodha Supporter Deepak Shenoy

August 7, 2025
Online OPD booking Sishu Bhawan
Trending Now

Cuttack Sishu Bhawan Introduces Online OPD Ticketing

August 7, 2025
Next Post
BRIC-inStem Trials

Dr. Jitendra Singh Reviews BRIC-inStem Trials, Hails Biotech’s Role in Future Economy

Renewable Energy Projects

SWC Grants In-Principle Approval for Renewable Energy Projects Worth ₹1191.47 Cr

BSF Jawan Purnam Kumar Shaw returns

BSF jawan detained by Pak Rangers after accidentally crossing border

Follow Us

  • 698 Followers

Recommended

Odisha heat wave alert

Scorching Heat in Bhubaneswar as Temperatures Climb to 35.6 °C

5 months ago
Shubman Gill

Shubman Gill Keeps Jasprit Bumrah’s Oval Test Inclusion Open; Arshdeep Singh on Standby for Debut

1 week ago
Anil Kumble

Kohli & Rohit’s Sudden Test Exits Spark BCCI Backlash, Kumble Demands Answers

3 months ago
Donald Trump

Donald Trump refutes NYT report claiming Elon Musk’s Pentagon briefing on ‘top secret China war plans’

5 months ago

Instagram

Follow Now

  • Shubman Gill Poised for T20I Return at Asia Cup; Jaiswal, Sudharsan in Contention Amid Selection Crunch

Shubman Gill is set for a T20I comeback as India prepare to announce their squad for next month’s Asia Cup, expected to be finalised in the third week of August. Gill, absent from the T20I setup since a bilateral series against Sri Lanka early last year, has missed three successive series but now returns with strong domestic form.

Read more:
https://pragativadi.com/shubman-gill-poised-for-t20i-return-at-asia-cup-jaiswal-sudharsan-in-contention-amid-selection-crunch/
  • Coolie vs War 2 North America advance booking: Rajinikanth’s film races ahead with $1.06M, Hrithik Roshan-Jr NTR follows at $168K

While Rajinikanth and Lokesh Kanagaraj
  • "Andhera" is a new urban horror series set to premiere on Amazon Prime Video. The show features a police officer and a haunted medical student investigating a sinister force in Mumbai. It
  • "Superman" (2025) has grossed an impressive $551 million worldwide, according to Box Office Mojo. This includes $316 million from domestic (North America) and $235 million from international markets, according to Koimoi. The film has surpassed Bradley Cooper
  • Ne Zha 2 was released in theaters across China on 29 January 2025, coinciding with the first day of the Chinese New Year.Like its predecessor, the film received highly positive reviews from critics for its animation, action sequences, worldbuilding, and emotional core, and achieved even greater commercial success.

With a current gross of more than $2.2 billion against a production budget of US$80 million, Ne Zha 2 broke numerous box office records inside and outside China. It became the highest-grossing film in a single box office territory and globally became the highest-grossing animated film, the highest-grossing non-English language film (being the first to gross over $2 billion), and the first animated film in history to cross the $2 billion mark.
  • RAVEENA TANDON IS GLOWING ON INSTAGRAM WITH HER LATEST POSTS ON HER VISIT TO A INDIAN TEMPLE AND HER MAHADEV DUPPATA HAS NETIZENS LOVING IT.
  • Source CONFIRMS Dhanush and Mrunal Thakur are dating, but want to keep their relationship low-key as it
  • The Hundred 2025, a cricket tournament featuring 100-ball matches, kicked off on August 5th, 2025, with a London derby doubleheader at Lord
  • Following the success of his debut film, Saiyaara, Ahaan Panday was seen in Mumbai, enjoying a low-key evening after a screening. News reports confirm he was spotted in a relaxed outfit and acknowledged the paparazzi with a wave and a smile before heading to his car, according to reports.

Highlights

United Airlines Grounds Flights Nationwide Amid Major Tech Outage

Notification Issued for Vice President’s Election; Nomination Process Begins

Odisha Launches ‘EKTA’ on National Handloom Day with Madhuri Dixit as Special Guest

Odisha Celebrates National Handloom Day by Empowering Women with Kotpad’s Traditional Mirigan Textile

6-Year-Old Indian-Origin Girl Assaulted in Suspected Racist Attack in Ireland

CRPF Bus Falls into Gorge in J&K, 3 Jawans Dead

Trending

Odisha Group C Recruitment 2025
Odisha

Odisha Group C Recruitment 2025: 22,896 Posts to Be Filled by August 31

by Itishree Sethy
August 7, 2025
0

The Odisha government has announced a major recruitment initiative to fill 22,896 Group C posts across 10...

Nithin Kamath

Nithin Kamath Invests in Capitalmind, Reunites with Early Zerodha Supporter Deepak Shenoy

August 7, 2025
Online OPD booking Sishu Bhawan

Cuttack Sishu Bhawan Introduces Online OPD Ticketing

August 7, 2025
United Airlines tech outage

United Airlines Grounds Flights Nationwide Amid Major Tech Outage

August 7, 2025
Vice President Election India 2025

Notification Issued for Vice President’s Election; Nomination Process Begins

August 7, 2025
Facebook Twitter Youtube RSS

ABOUT US

News, as it should be covered, has been the forte of Pragativadi over the years. And this has ensured a classy readership encompassing the who’s who of the state. The people who matter in Odisha, depend on Pragativadi. For opinion leaders, decision makers and people with surplus disposable income Pragativadi is a must.

Follow us on social media:

Blog

The Chinese smartphone upstarts taking on Apple and Samsung

by pragativadinewsservice
January 11, 2025
0

Presidential Train Now Available For Jakartans Traveling To Bandung

by pragativadinewsservice
January 10, 2025
0

News Calendar

August 2025
M T W T F S S
 123
45678910
11121314151617
18192021222324
25262728293031
« Jul    

© 2025 Pragativadi

Welcome Back!

Login to your account below

Forgotten Password?

Retrieve your password

Please enter your username or email address to reset your password.

Log In
No Result
View All Result
  • Home
  • Epaper
  • ———————
  • Odisha
  • Twin City
  • Sports
  • Politics
  • Entertainment
  • National
  • World
  • Business
  • Tech
  • Lifestyle
  • Travel
  • ———————
  • About us
  • Privacy Policy
  • Disclaimer
  • Contact

© 2025 Pragativadi